Search for notes by fellow students, in your own course and all over the country.

Browse our notes for titles which look like what you need, you can preview any of the notes via a sample of the contents. After you're happy these are the notes you're after simply pop them into your shopping cart.

My Basket

You have nothing in your shopping cart yet.

Title: ACI Test with Real Questions and Answers 2024.
Description: ACI Test 2024. Includes real questions and answers, providing a comprehensive guide for exam preparation. Covers essential topics to help you master the material and succeed in the ACI certification test. Ideal for candidates aiming to enhance their knowledge and excel in the exam with confidence. Perfect for effective and thorough exam preparation.

Document Preview

Extracts from the notes are below, to see the PDF you'll receive please use the links above


ACI Test with Real Questions and
Answers 2024
...
The rolling process should be continued for a minimum of - ANS1min
****
...
- ANS
****Specimens made for determining when a structure can be placed in service shall be
removed from their molds at the same time the formwork is removed
...
- ANSF
1
...
x 6in
10
...
25% within a 2 minute
period
11
...
- ANST
11
...
25%
12
...
- ANS2
12
...
When vibration is used to consolidate concrete in a standard cylinder mold,
___________ layers of concrete in the mold should be used
...
The standard sized compressive cylinder and flexural beam molds are used for
concrete with nominal maximum sized coarse aggregate up to _________
...
The volumetric method measures the volume of air present within - ANSthe paste
fraction only

3
...
- ANSa vibrator
3
...
The rod should __________________________when rodding the second and third
layers of concrete in the measure
...
penetrate the underlying layer about 1 inch
...
Wet sieve a sufficient amount of material for the volumetric air content test over a
______ in
...
5in
...
- ANS1
5
...
- ANS2
6
...
- ANST
6
...
The excess concrete above the rim of the bowl is struck off using - ANSstrike off bar
6
...
ANSF
7
...
5% and the aggregate correction
factor for the concrete mixture is 0
...
The final air content for this mixture is - ANS5
...
5% = 5
...
Concrete test specimens with a specified compressive strength less than 6,000psi,
should be initially cured in a temperature range from - ANS60 to 80
7
...
- ANS1 pint
8
...

8
...
To insure that the measure is completely full with concrete and the surface is level,
strike off the top surface of concrete using ________
...
T or F - ANST
A flexural beam is filled in ______ layer(s) of approximately equal depth
...
- ANST
ACI Field Testing Technicians, Grade I or equivalent certification is not required is
required when testing for slump, air content, and density, but not for making test
specimens
...
release the pressure in the bowl by opening the
petcocks
...
- ANSF
Begin molding test specimens within ______ minutes after obtaining the composite
sample - ANS15 minutes
Confirmation of the initial meter reading is obtained when the difference between the
initial and final meter readings are within ________ of each other
...
25%
Gently press concrete around the thermometer such that the_______ does not
affect the reading
...
the test is
invalid and the sample should be discarded
...
- ANSthe weight and volume of the filled measure as well as the weight of
the
empty measure
...

- ANST
It is allowable to use the Air Content by Pressure Method test to measure the air content
of fresh concrete made with - ANSdense aggregates only

It is permissible to use the Volumetric Method to determine the air content of fresh
concrete made with - ANSlightweight aggregates only
it may require up to ___ min before the temp stabilizes when the NMS of the coarse agg
is greater than ___ - ANS20min
...

MAKING AND CURING CONCRETE - ANS
Proper consolidation of concrete in the bowl of the pressure meter is accomplished by ANSeither rodding or vibration depending on the slump of the concrete
Raise the mold vertically a distance of 12 inches - ANSin5±2seconds
SLUMP TEST - ANS
Strike off the top surface of the concrete by using - ANSeither strike off bar or plate
Submerge the sensing portion of the thermometer at least ______ inches into the
concrete - ANS3
TEMPERATURE - ANS
Test specimens shall not be transported until at least ______ hours after initial set has
occurred
...
, 3 x NMS
The diameter of a cylinder mold shall be at least _______ times the nominal maximum
size of the coarse aggregate used in the concrete mixture
...
5%
...
3
...
- ANS
...
5 - 0
...
2, rounded to 5
...

The height of the slump cone is - ANS12 in
The length of the tamping rod for the air pressure test shall not be less than - ANS16 in

The primary objective of the sampling process is to obtain a representative sample (T or
F) - ANST
The size of the measure used in determining the density of fresh concrete _______
...
is based on the nominal maximum size aggregate
The slump mold is filled with three layers of concrete - ANSby volume
The slump of a mixture is found by - ANSmeasuring the vertical distance to the
displaced original center on the top
surface of the slumped concrete
...
- ANS1
...
- ANS1,30to120
The Temperature Measuring Device used for determining concrete temperature must
be calibrated ______ or whenever there is a question of accuracy
...
In addition, the temperature measurement must be completed within
_______ minutes after obtaining the sample
...
- ANS2
When it is necessary to wet sieve the concrete sample, wet sieving should be
performed after the individual samples are remixed into a composite sample (T or F) ANSF

When sampling from a paving mixer it is not acceptable to place 3 small containers on
the sub grade in order to obtain the required samples of concrete (T or F) - ANSF
When sampling from a revolving drum truck mixer collect concrete from ______ portions
of the batch - ANS2 or more
When test specimens are to be molded, it is not necessary to determine the slump, air
content, and temperature of fresh concrete
...
sieve, wet
sieve a sufficient amount of material for the air content test (ASTM C 231) over a
______ sieve - ANS1
...
- ANS2
Yield represents the ________
...
volume of concrete produced per batch


Title: ACI Test with Real Questions and Answers 2024.
Description: ACI Test 2024. Includes real questions and answers, providing a comprehensive guide for exam preparation. Covers essential topics to help you master the material and succeed in the ACI certification test. Ideal for candidates aiming to enhance their knowledge and excel in the exam with confidence. Perfect for effective and thorough exam preparation.